Remodeling in Round Rock, TX
Kitchens, baths, ADUs, and outdoor living for Round Rock homeowners. Owner-led, fixed line-item pricing, and every City of Round Rock permit and inspection handled for you.
What remodeling in Round Rock actually involves
Round Rock sits in Williamson County, about 20 miles north of downtown Austin along I-35, and it runs its own Building Inspection Division rather than permitting through the City of Austin. That single fact changes how a remodel here has to be scheduled. Round Rock requires a permit for essentially any alteration to a home, including mechanical, electrical, and plumbing work, and the city publishes a plan review time of approximately 30 business days from the date the application is received and accepted with no expedited option. A contractor who treats a Round Rock kitchen like an Austin kitchen will be six weeks late before demolition starts.
HN Construction & Remodeling builds that review window into the schedule from day one, filing the permit while cabinets are still being drawn. Every project is owner-led, priced as a fixed line-item written estimate, and built by one in-house team through design, demolition, plumbing, electrical, cabinetry, stone, tile, and finish work.
- Permitting authority
- City of Round Rock
- Plan review
- ~30 business days
- ZIP codes served
- 78664, 78665, 78681
Serving Round Rock from our Austin shop
We do not run a storefront in Round Rock. Our crew works out of Austin and is on site in Round Rock, Teravista, Behrens Ranch, and Forest Creek regularly, and every permit is pulled through the City of Round Rock. Estimates are free and on site.
What we build in Round Rock
Each service below has its own Round Rock page covering the local scope, cost range, and permitting for that specific type of work.
- Kitchen Remodeling in Round RockScope, cost range, and permitting for Round Rock homes
- Bathroom Remodeling in Round RockScope, cost range, and permitting for Round Rock homes
- ADU Construction in Round RockScope, cost range, and permitting for Round Rock homes
- Decks in Round RockScope, cost range, and permitting for Round Rock homes
- Covered Patios in Round RockScope, cost range, and permitting for Round Rock homes
- Pergolas in Round RockScope, cost range, and permitting for Round Rock homes
- Outdoor Kitchens in Round RockScope, cost range, and permitting for Round Rock homes
Round Rock housing stock, and what it means for your remodel
Round Rock is a tract-construction city, and the build era of your subdivision predicts the job more reliably than square footage does. Homes sit on slab foundations over Central Texas expansive clay, which moves through wet and dry cycles and shows up as out-of-level floors, cracked grout lines, and cabinet runs that need shimming to sit true. On a slab, moving a sink or adding a gas line to an island means saw-cutting and trenching concrete, so that decision gets made during design rather than discovered during demolition.
The most requested Round Rock project is the open-concept conversion: taking out the wall between a closed galley or L-shaped kitchen and the family room. In these floorplans that wall is frequently load-bearing, and the City of Round Rock requires an engineered design for structural modifications, so the beam is engineered and permitted rather than improvised.
- Forest Creeklate 1980s-1990s
Golf-course community and some of the oldest large-tract stock in the city, which makes it the most common full-gut candidate.
- Behrens Ranch1990s-2000s
Larger lots and two-story plans, where the kitchen usually opens to a two-story family room.
- Chandler Creek1980s-1990s
Older east-side stock, more likely to need electrical and plumbing brought up to current code during a remodel.
- Teravista2000s-2010s
Straddles the Round Rock and Georgetown line. Newer stock, so the work is finish-level rather than structural.
- Paloma Lake2000s-2010s
Master-planned with an active HOA, so exterior work goes through architectural review.
- Mayfield Ranch2000s-2010s
North Round Rock, with wide great-room shells that suit a large island.
- Stone Oak2000s
Compact plans where opening the kitchen wall makes the biggest difference.
- Sonoma2000s
Northeast Round Rock, where galley and L-shaped kitchens are the norm.
City of Round Rock permitting, in plain terms
Round Rock permits through its own City of Round Rock Building Inspection Division at 301 W Bagdad Ave, Suite 100, Round Rock, TX 78664, reachable at 512-218-5550, open Monday to Friday, 7:00 a.m. to 4:00 p.m.. Applications run through the city’s Permit Portal. Here is what that means for your project.
Plan review runs about 30 business days
The city reviews in approximately 30 business days from the date the application is received and accepted, and states that no expedited review is available. We submit during design so review runs alongside cabinet lead times instead of after them.
The one-permit system
Round Rock runs a strict one-permit system. The general contractor and every relevant subcontractor must be named on the application and must then accept their assignment through their own Permit Portal account before the permit can be issued.
Contractor registration
All contractors and subcontractors must be registered with the city before they can be added to a permit. There is no registration fee and no annual fee.
Fees, as of 2026-09-06
The residential remodel and addition permit fee is $500, non-refundable and non-transferable. It covers two inspections of each type; after the same inspection fails twice, each additional one is $75. The city offers one free consultation, then $75 each. We pass city fees through at cost.
Inspections
Inspections are requested by 4 p.m. for the following business day (availability is not guaranteed) and performed Monday to Friday between 8:00 a.m. and 3:00 p.m. We schedule and meet every one.
Structural work and pre-1980 homes
Structural modifications, such as removing a wall to open up a kitchen, require an engineered design. The city strongly recommends an asbestos survey if walls are being removed from a home built before 1980.
Needs a Round Rock permit
- Residential remodels, meaning any improvement, modification, structural change, addition, or alteration, including mechanical, electrical, and plumbing work
- Decks and covered patios
- Pergolas, gazebos, and outdoor kitchens
- Sheds, studio sheds, and detached garages
- In-ground and above-ground pools, spas, and hot tubs
- Garage conversions, which are permitted only on lots platted before 2002
- Standby generators, solar panels, and irrigation systems
- Complete demolition
Does not need a permit
- Window replacement
- Siding replacement
- Residential re-roofing, unless the roof structure itself is being modified
- Concrete flatwork, including sidewalks, walkways, driveways, and driveway extensions
- Residential fences, which instead go through Code Enforcement review for height and material
Codes currently enforced in Round Rock
- 2024 International Residential Code (IRC)
- 2024 International Building Code (IBC)
- 2024 International Plumbing Code (IPC)
- 2024 International Mechanical Code (IMC)
- 2024 International Energy Conservation Code (IECC)
- 2023 National Electrical Code (NFPA 70)
Permit requirements, fees, and review times on this page were verified against the City of Round Rock’s published pages on 2026-09-06 and can change. Confirm current requirements with the Building Inspection Division before you budget. Sources: City of Round Rock - Residential Single Family Remodel & Additions; City of Round Rock - Homeowner Projects; City of Round Rock - Building Inspection Division.
HOA architectural review in Round Rock
Most of Round Rock’s master-planned communities, including Teravista, Paloma Lake, Behrens Ranch, Mayfield Ranch, and Forest Creek, are governed by an active HOA with an architectural control committee. Anything visible from the street or from a neighboring lot generally needs written ACC approval before work starts, and that approval runs on the HOA’s own calendar, entirely separate from the city permit.
Work that typically needs ACC approval
- Covered patios, pergolas, and patio extensions
- Outdoor kitchens and built-in grills
- Deck construction and railing changes
- Detached structures, including ADUs and studio sheds
- Roofline changes, new roof penetrations, and range-hood vent terminations on a street-facing elevation
- Window and exterior door replacement where the style, color, or grid pattern changes
- Exterior paint, stone, and siding changes
A purely interior kitchen or bathroom remodel usually does not need ACC approval, but it still needs a city permit. That is the reverse of what most homeowners assume.
Round Rock projects
What Round Rock homeowners say
Round Rock kitchen remodeling ideas
A look at the kitchen styles we build for Round Rock homeowners. Photos of our own finished Round Rock kitchens are coming soon.






Round Rock remodeling - frequently asked questions
Answers specific to the City of Round Rock, not general Austin-area advice.
Do I need a permit to remodel a kitchen in Round Rock?
How long does a Round Rock remodel permit take to get approved?
Why does my contractor need to be registered with the City of Round Rock?
Can I convert my garage into living space in Round Rock?
What does a Round Rock building permit cost?
Do I need HOA approval as well as a city permit in Round Rock?
Which building codes does Round Rock enforce?
Do you have to test for asbestos before a Round Rock remodel?
HN Construction & Remodeling also serves nearby Pflugerville, Cedar Park, Georgetown, and Hutto. See all service areas.
Planning a Round Rock remodel?
Call (512) 956-8583, email [email protected], or request a free quote. We respond within 24 hours with a fixed, line-item estimate, and we file your City of Round Rock permit as part of the job.