HN Construction & Remodeling
White shaker kitchen with a blue waterfall-edge quartz island, brass hardware, and a geometric tile backsplash, remodeled by HN Construction & Remodeling in Austin, TX
14 Years Remodeling in Austin, TX

Custom Kitchens, Baths, ADUs & Outdoor Living in Austin, TX

Locally owned, fully licensed, and 14 years deep - we design and build Austin remodels you’ll actually love living with.

14 Years in BusinessAustin, TXLicensed & InsuredBBB A+ Rating200+ Projects CompletedOwner-Led ProjectsFixed, Line-Item PricingFree Estimates
Who We Are

A locally owned construction company built on accountability.

For 14 years, HN Construction & Remodeling has built kitchens, bathrooms, ADUs, and outdoor living spaces for homeowners across the greater Austin area. What started as a small outdoor-living crew is now a full-service construction company - still locally owned, still obsessed with the details that make a project last.

Every project we take on is led by an owner. That means clear communication from the first phone call to the final walkthrough, written and dated schedules, line-by-line pricing, and craftsmanship we’d want in our own homes.

Licensed, fully insured, and proud of every project we put our name on. If you’re thinking about a remodel, an ADU, or an outdoor build - we’d love to walk through it with you.

Recent Projects

Our work, on display.

A selection of recently completed projects across Austin and the surrounding metros.

Modern white kitchen remodel by HN Construction with white shaker cabinets, brass hardware, a geometric white tile backsplash, and under-cabinet lighting
Kitchen · Austin
Modern White & Gold Kitchen
White guest house with front porch and wooden deck
ADU · Austin
Bouldin Backyard Cottage
Composite-style deck with wooden table and chairs under a clear blue sky
Outdoor · Round Rock
Round Rock Composite Deck
Luxury bathroom remodel by HN Construction with dark onyx-look marble tile, a lit hexagon shower niche, and brushed-gold fixtures
Bathroom · Austin
Onyx Marble Walk-In Shower
Two-tone farmhouse kitchen remodel with navy lower cabinets, white uppers, granite countertops, and a gray herringbone tile backsplash
Kitchen · Austin
Navy & White Farmhouse Kitchen
Recently completed Georgetown backyard ADU with sage Hardie lap siding, dark trim, and sliding glass door
ADU · Georgetown
Georgetown Backyard ADU
Modern Bee Cave outdoor lounge with stone fireplace, cantilever umbrella, and pool
Outdoor · Bee Cave
Bee Cave Outdoor Lounge & Fireplace
Bright bathroom remodel with white-and-blue marble-look tile, a lit hexagon shower niche, and a soaking tub
Bathroom · Austin
White Marble Bath & Soaking Tub
Small cabin-style home with floor-to-ceiling glass front
ADU · Round Rock
Round Rock Cabin-Style ADU

Thinking about a remodel in Austin?

Free on-site estimates · Locally owned since 2012 · We respond within 24 hours

Our Commitment

Three things you can count on, every project.

Precision Planning

Every layout, material, and finish is finalized in 3D before demo begins. You see the project before you live it - and we don’t start swinging hammers until you’ve approved the plan.

Honest Communication

Weekly written progress updates and a single point of contact for the entire build. No “your guy’s out today” surprises and no chasing for status.

Built to Last

Materials, fasteners, and detailing chosen specifically for the Austin climate - heat, sun, summer storms, and the way Texans actually use a home.

14
Years in Business
200+
Projects Completed
3D
Design First
100%
Owner-Led
Trusted By

Recognized by the platforms homeowners actually trust.

What a remodel costs in Austin in 2026

The honest answer to "what will this cost" is that it depends on scope, not square footage. A kitchen where the cabinets and countertops are replaced in the existing layout is a fundamentally different job from one where a wall comes down and the plumbing moves. Below are the ranges HN Construction & Remodeling actually quotes across the greater Austin area in 2026. Every project is priced as a fixed, line-item written estimate before work begins, so the number you sign is the number you pay, and any change order is quoted in writing first.

ProjectTypical 2026 Austin rangeWhat moves the number
Kitchen remodel$25,000 - $90,000+Cabinet tier (stock, semi-custom, custom), countertop material, and whether walls or plumbing move.
Bathroom remodel$12,000 - $50,000+Shower size and waterproofing, tile selection, vanity, and whether the drain relocates in a slab.
ADU construction$150,000 - $350,000+Detached vs. garage conversion, size, utility runs, and City of Austin or municipal permitting.
Deck$8,000 - $35,000Material (pressure-treated, cedar, composite, ipe), height, and railings. Elevation is the big driver.
Covered patio$15,000 - $45,000Attached vs. freestanding, roof type, and whether it includes a new slab or electrical.
Pergola$5,000 - $25,000Cedar vs. steel vs. louvered aluminum, and whether the roof is fixed or adjustable.
Outdoor kitchen$15,000 - $60,000+Appliance package and the cost of running gas, water, and electrical to the location.

Two things reliably save money without cheapening the result: keeping plumbing where it is, and choosing where to spend. In a kitchen, cabinets are usually 30 to 40 percent of the budget, so moving from custom to a quality semi-custom line frees more room than downgrading countertops or tile. In a bathroom, keeping the shower drain in place avoids cutting and re-pouring a slab. We walk through those trade-offs at the free estimate, before you commit to anything.

How long an Austin remodel actually takes

Most of the calendar on a remodel is not construction. It is design decisions, product lead times, and permit review. Cabinets alone typically carry a 4 to 12 week lead time, which is why we finalize design and order long-lead items before demolition rather than after. Permit timelines vary by jurisdiction: the City of Austin runs its own review, and suburbs like Round Rock, Cedar Park, and Georgetown each run separate building departments with their own queues. We file during design so review runs in parallel instead of stalling the job.

ProjectDesign + permittingOn-site construction
Kitchen remodel3 - 6 weeks6 - 12 weeks
Bathroom remodel2 - 4 weeks3 - 6 weeks
ADU construction2 - 5 months4 - 8 months
Deck1 - 3 weeks1 - 3 weeks
Covered patio3 - 6 weeks2 - 5 weeks
Pergola1 - 3 weeks1 - 2 weeks
Outdoor kitchen2 - 5 weeks3 - 6 weeks

You get a written, dated schedule before the first day of demolition, and it is updated weekly so you always know which trade is on site and what comes next. If something slips, which occasionally happens when a wall opens up and reveals something nobody could see, you hear it from us the same week, not at the end.

How we run a project, step by step

Every HN Construction project follows the same sequence, and an owner runs it from the first phone call to the final walkthrough. There is no project manager handoff and no rotating cast of subcontractors you have never met.

  • Free on-site consultation. We come to your home, measure, listen to how you actually use the space, and talk through what is realistic for your budget.
  • Design and 3D signoff. You see the layout, cabinetry, and finishes rendered before anything is ordered, with two or three options where the layout allows.
  • Fixed line-item estimate. Every cost is itemized. You approve a number, not a range.
  • Permitting. We pull the building and trade permits under our own contract through the correct authority, whether that is the City of Austin or your suburb, and schedule every inspection.
  • Ordering and scheduling. Long-lead items are ordered and the written, dated schedule is issued before demolition.
  • Demolition and rough-in. Framing, plumbing, electrical, and any structural work, inspected at each stage.
  • Finishes. Cabinetry, stone, tile, paint, lighting, and hardware installed by our in-house team.
  • Punch list and walkthrough. We walk the finished space with you and close out every item before we call it done.

Materials we build with, and how they hold up in Texas

Central Texas is hard on building materials. Intense UV, wide temperature swings, hard limestone-influenced water, and expansive clay soils that move under slabs and footings all shorten the life of the wrong product. These are the materials we specify and why.

CategoryWhat we build withWhy it holds up here
CabinetryPlywood-box semi-custom and custom; painted maple, white oak, walnutPlywood boxes tolerate Austin humidity swings far better than particleboard, which swells if a dishwasher ever leaks.
CountertopsQuartz, granite, quartzite; concrete and stainless outdoorsQuartz resists the etching that hard Austin water causes on marble. Granite and quartzite handle direct sun and heat outdoors.
Shower waterproofingSheet or liquid membrane over a correctly pre-sloped panMost shower failures are waterproofing failures, not tile failures. This is the layer nobody sees and the one that decides the lifespan.
DeckingCedar, composite (Trex, TimberTech), ipe hardwoodComposite will not splinter or fade the way wood does in full Texas sun, and stays cooler underfoot. Ipe is the longest-lasting natural option.
Patio and pergola structureCedar, powder-coated steel, louvered aluminumProperly anchored footings and powder-coated hardware resist both Texas wind and the rust that follows a wet spring.
Fasteners and flashingHot-dip galvanized or stainless; flashed ledgersThe parts nobody sees are what fail first. Correct fasteners and ledger flashing are why a deck is still tight after five summers.

Austin neighborhoods and suburbs we build in

HN Construction & Remodeling works throughout Austin proper and the surrounding metro. In central Austin that means the older bungalows and mid-century homes of Hyde Park, Rosedale, Crestview, Allandale, Bouldin Creek, Travis Heights, and Clarksville, where a remodel usually means bringing decades-old wiring and plumbing up to code behind finishes that still suit the house. Closer to Lady Bird Lake and Zilker Park, in Barton Hills and Zilker, lots are tighter and access matters as much as design. In Tarrytown and Westlake Hills the work runs to the high end, with custom cabinetry and natural stone. In Mueller and Circle C Ranch, where the housing stock is newer, the job is usually opening the plan and upgrading a builder-grade kitchen rather than correcting old systems.

Outside the city we build across the northern and western suburbs: Round Rock, Cedar Park, Georgetown, Leander, Pflugerville, Hutto, Liberty Hill, and Manor to the north and east, Lakeway, Bee Cave, and Dripping Springs out toward Lake Travis and the Hill Country, and Kyle and Buda to the south. Each of those cities runs its own building department with its own permit requirements and review times, and we pull the permit and schedule the inspections wherever your home sits. Every city we serve has its own page with local permitting details, neighborhoods, and pricing.

FAQ

Austin remodeling - frequently asked questions

How much does a kitchen remodel cost in Austin?
Most Austin kitchen remodels run $25,000 to $45,000 for a cosmetic refresh in the existing layout, $45,000 to $90,000 for a full mid-range remodel with new semi-custom cabinets and quartz countertops, and $90,000 and up for high-end or structural work. Cabinets are typically 30 to 40 percent of the budget. HN Construction & Remodeling prices every kitchen as a fixed, line-item written estimate.
How much does a bathroom remodel cost in Austin?
Austin bathroom remodels typically run $12,000 to $25,000 for a straightforward update, $25,000 to $50,000 for a full mid-range primary or guest bath, and $50,000 and up for large or structural projects. Moving a shower or toilet drain in a slab foundation requires cutting and re-pouring concrete, which is the single biggest cost driver.
Do you pull the permits, or do I have to?
We do. HN Construction & Remodeling pulls the required building and trade permits under its own contract and schedules every inspection, whether the home is permitted through the City of Austin or through a suburb like Round Rock, Cedar Park, Georgetown, or Lakeway. Each of those cities runs its own building department with different requirements and review times.
How long will my remodel take?
A kitchen is usually 6 to 12 weeks of on-site construction after 3 to 6 weeks of design and permitting. A bathroom is 3 to 6 weeks on site. Decks and pergolas are 1 to 3 weeks. ADUs run 4 to 8 months of construction. Cabinet lead times of 4 to 12 weeks are often the real constraint, which is why we finalize design and order before demolition.
What areas around Austin do you serve?
We serve Austin and the greater Austin metro, including Round Rock, Cedar Park, Georgetown, Leander, Pflugerville, Hutto, Liberty Hill, Lakeway, Bee Cave, Kyle, Buda, Dripping Springs, and Manor, plus Austin neighborhoods such as Tarrytown, Zilker, Hyde Park, Mueller, Circle C Ranch, and Westlake Hills.
Is the estimate really free, and is there any obligation?
Yes, the on-site estimate is free and there is no obligation. We come to your home, take measurements, talk through what is possible, and prepare a fixed line-item written estimate. You are free to take that number elsewhere. We do not do hard sells or pressure closes.
Are you licensed and insured?
Yes. HN Construction & Remodeling is licensed and fully insured, and holds an A+ rating with the Better Business Bureau. All structural, electrical, plumbing, and gas work is permitted and inspected.
Do you use subcontractors or your own crew?
Our own in-house team handles design, demolition, plumbing, electrical, cabinetry, stone, tile, and finish work. That is what lets us hold a schedule and stand behind the result, rather than coordinating a rotating cast of subs who each answer to someone else.
What happens if the price changes mid-project?
It does not change unless you change the scope or we uncover something genuinely hidden, like failed wiring behind a wall. In either case the change order is quoted in writing and approved by you before any work happens. The fixed line-item estimate you sign is the number you pay.
Can I stay in my home during the remodel?
For most bathroom, deck, patio, and outdoor projects, yes. For a full kitchen remodel, most homeowners stay but set up a temporary kitchen elsewhere in the house, since the space is unusable for several weeks. We talk through containment, dust control, and the realistic disruption window at the estimate.
How soon can you start?
It depends on the season and the size of the job. Because cabinets carry a 4 to 12 week lead time and permit review adds weeks on top, the sooner design starts the sooner we can schedule construction. Call (512) 956-8583 for current availability.
What makes HN Construction different from other Austin remodelers?
An owner runs every project from first call to final walkthrough, pricing is fixed and line-item rather than an open range, schedules are written and dated and updated weekly, design is finalized in 3D before demolition, and the trades are in-house. We have been building in Austin since 2012.
Free Quote

Get Your Free Quote

Tell us about your project and we’ll respond within 24 hours. Free, no-obligation consultation.

Or call us directly
512-956-8583
Service area
Austin, TX
Hours
Mon-Fri: 8am-9pm
Sat-Sun: Closed

We typically respond within 24 hours. No obligation, no pressure.

Call NowGet Quote